Pollution Abatement Works for River Saryu/Ghaghara at Faizabad town, District-Ayodhya (Interception & Diversion of Drains with 33 MLD STP)
On Going
Ayodhya
NGP
HAM
221.660000
109.030000
7.62
May 6 2021
105.010000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
33.0000
SBR
2
MPS (MLD)
41.6000
MSP
3
Boundary wall (mtr.)
200.0000
BW
4
Effluent Disposal Line (km.)
0.0600
Effluent Line
5
Rising main (mtr.)
0.4000
Rising Main
6
Sewer Line (km.)
3.8800
Trunk Sewer
M/s Eco Protection Engineer Pvt Ltd
149.470000
Jan 2 2025
3/3/2023 12:00:00 AM
Jun 20 2025
27
Interception, Diversion of Balance 7 drains and Augmentation of Rajapur STP capacity by 90 MLD (Sewerage District-D) at Prayagraj Uttar Pradesh under DBOT mode
On Going
PrayagRaj
NGP
DBOT
475.980000
242.850000
15.24
Jan 27 2023
217.890000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
7.0000
NA
2
Sewer Line (km.)
4.2000
NA
3
Rising main (mtr.)
3.4500
NA
4
STP (MLD)
90.0000
NA
5
Effluent Pumping Station (MLD)
90.0000
NA
6
Effluent Disposal Line (km.)
0.3000
NA
7
Rehabilitation of Bund and Bund Road
1.0000
NA
8
MPS (MLD)
56.0000
NA
9
MPS (MLD)
39.0000
NA
M/s Triveni Engineering and Industries
309.740000
Feb 23 2026
8/24/2024 12:00:00 AM
28
Mathura sewerage scheme (I&D and STP Works for balance drain)
On Going
Mathura
NGP2-NON EAP
HAM
292.560000
149.850000
9.61
Sep 7 2022
133.100000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
60.0000
SBR
2
MPS (MLD)
60.0000
At STP campus
3
Interception And Diversion
4.0000
04 Nos. Drain tapping
4
IPS (MLD)
34.0000
34.08 MLD capacity, Dairy farm
5
IPS (MLD)
13.0000
13.08 MLD capacity, Kala Patthar
6
Rising main (mtr.)
9290.0000
9.29 Km. (600 and 1000mm DI, 1300mm PSC)
7
Interception & Diversion, Sewer Line, MPS and STP
1970.0000
1.97 Km. (300, 450,700, 800,1000 and 1400 mm dia)
M/s EIEL Mathura Infra Engineers Private Limited
240.010000
Nov 29 2026
11/30/2024 12:00:00 AM
Nov 29 2026
29
Interception, Diversion of Balance 13 drains and Augmentation of Salori STP capacity by 43 MLD (Sewerage District-C) at Prayagraj Uttar Pradesh under DBOT mode
On Going
PrayagRaj
NGP
DBOT
331.750000
180.270000
11.22
Mar 14 2023
140.270000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
13.0000
NA
2
Sewer Line (km.)
2.1600
NA
3
STP (MLD)
43.0000
NA
4
Effluent Pumping Station (MLD)
43.0000
NA
5
Effluent Disposal Line (km.)
0.3000
NA
6
Rehabilitation of Sewer Line
3.3000
NA
7
32 MLD AB Culvert SPS
32.0000
NA
8
3 MLD Sitaram Ghat SPS
3.0000
NA
9
Rising main (mtr.)
4070.0000
NA
M/s HNB Private ltd. - M/s Tirupati Cements Products (JV)
204.400000
Aug 18 2025
3/19/2024 12:00:00 AM
30
Interception, Diversion of Balance discharge of 02 drains and 50 MLD STP to Augment existing Treatment Capacity (80 MLD) Naini STP for Sewerage District-A at Prayagraj Uttar Pradesh under DBOT mode
On Going
PrayagRaj
NGP
DBOT
186.470000
83.710000
5.44
Sep 5 2023
97.320000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
2.0000
NA
2
Sewer Line (km.)
0.0600
NA
3
SPS (MLD) 2A
3.5000
NA
4
Rising main (mtr.)
0.1000
NA
5
STP (MLD)
50.0000
NA
6
Co-treatment Unit for Fecal Sludge (KLD)
20.0000
NA
M/s JWIL-SSG (Joint Venture)
95.570000
Jul 3 2026
3/4/2025 12:00:00 AM
31
Prevention of Pollution of River Ramganga at Moradabad
Completed Project
Moradabad
Non EAP
DBOT
330.030000
278.850000
19.03
Feb 24 2011
32.170000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
245.5200
SBR
2
SPS (MLD) 2A
11.0000
SBR
3
Rising main (mtr.)
7.9000
SBR
4
Electrical & Mechanical works (Pumps)
55.0000
SBR
5
Transmission lines (Km)
11.0000
SBR
6
O & M
5.0000
SBR
7
Nala Tapping Arrangement ( No.)
14.0000
SBR
8
STP (MLD)
58.0000
SBR
M/s Larsen & Toubro Limited
244.000000
Apr 20 2013
12/21/2011 12:00:00 AM
Jun 1 2022
32
Sewerage Scheme for District A
Completed Project
PrayagRaj
NGRBA EAP
DBOT
299.390000
269.100000
19.75
Nov 11 2019
10.540000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
220.0000
NA
2
Rising main (mtr.)
2.3400
NA
3
SPS (MLD) 2A
30.0000
NA
4
SPS (MLD) 2A
8.0000
NA
5
SPS (MLD) 2A
11.0000
NA
6
Sewer House Connection
26573.0000
NA
M/s L&T Construction, WSW & C-IC, Network Project
292.290000
Apr 26 2018
4/27/2015 12:00:00 AM
33
Sewerage Scheme for District B
Completed Project
PrayagRaj
NGRBA EAP
DBOT
300.840000
278.280000
18.81
Nov 11 2019
3.750000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
213.8100
NA
2
SPS (MLD) 2A
5.0000
NA
3
Rising main (mtr.)
0.3200
NA
4
Sewer House Connection
27000.0000
NA
M/s EMS India Pvt Limited JV with M/s UEM India Pvt Ltd
280.860000
Jun 24 2019
6/25/2016 12:00:00 AM
34
Sewerage Scheme for District C
Completed Project
PrayagRaj
NGRBA EAP
DBOT
170.950000
154.010000
9.87
Sep 13 2019
7.070000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
146.2700
NA
2
SPS (MLD) 2A
4.9500
NA
3
SPS (MLD) 2A
5.4000
NA
4
Uppgradation of SPS
29.0000
NA
5
Rising main (mtr.)
0.7300
NA
6
Sewer House Connection
22500.0000
NA
M/s Passavant Energy & Environment
165.410000
Apr 6 2017
4/7/2015 12:00:00 AM
35
Sewerage work in Sewerage District E of Allahabad
Completed Project
PrayagRaj
NGRBA EAP
DBOT
142.000000
126.700000
6.57
Feb 22 2011
8.730000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
111.3500
NA
2
SPS (MLD) 2A
15.0000
NA
3
SPS (MLD) 2A
10.0000
NA
M/s UEM India Pvt Ltd
123.050000
Dec 6 2013
12/7/2011 12:00:00 AM
36
Sewer Network in District E of Allahabad Part-II
Completed Project
PrayagRaj
NGRBA EAP
DBOT
52.780000
48.900000
3.88
Sep 28 2016
0.000000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
46.2500
NA
M/s EMS India Pvt Limited JV with M/s UEM India Pvt Ltd
46.690000
Jul 9 2018
4/10/2017 12:00:00 AM
37
14 MLD Capacity STP at Salori Allahabad
Completed Project
PrayagRaj
NGRBA EAP
DBOT
39.360000
24.250000
1.90
Jul 9 2020
13.210000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
14.0000
SBR
2
SPS (MLD) 2A
14.0000
NA
3
Effluent Pumping Station (MLD)
43.0000
NA
4
Rising main (mtr.)
0.1700
NA
M/s UEM India Pvt Ltd
53.390000
May 13 2016
11/14/2014 12:00:00 AM
38
Pollution Abatement of Gomti River (Phase-II, Part-I) Lucknow
On Going
Lucknow
NGP
DBOT
264.670000
137.550000
8.53
Jan 30 2023
118.600000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
50.0000
SBR
2
Interception And Diversion
3.0000
-
3
Rising main (mtr.)
3.5000
Open Cut/Trenchless
4
SPS (MLD)
22.6000
-
M/s R.K. Engineers- Khilari Infrastructure (JV)
187.740000
Mar 13 2026
6/14/2024 12:00:00 AM
39
Sewerage and Non Sewerage Schemes for Pollution abatement of River Ganga at Allahabad District B&EU.P
Completed Project
PrayagRaj
Non EAP
DBOT
207.390000
187.530000
19.86
May 6 2010
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
50.0000
Biotower+ASP
2
MPS (MLD)
50.0000
NA
3
SPS (MLD) 2A
15.0000
NA
4
Rising main (mtr.)
7.6500
NA
5
SPS (MLD) 2A
15.0000
NA
6
Rehabilitation of SPS/MPS
16.5000
NA
7
STP (MLD)
25.0000
Biotower+ASP
8
MPS (MLD)
25.0000
NA
9
STP (MLD)
10.0000
Biotower+ASP
10
MPS (MLD)
10.0000
NA
11
Sewer Line (km.)
3.7700
NA
12
Rehabilitation of Sewer Line
10.6800
NA
13
Uppgradation of SPS
35.0000
NA
14
Upgradation of MPS
80.0000
NA
15
Upgradation of STP
20.0000
ASP
M/S HNB Engineers Private Ltd.
118.200000
Mar 31 2016
4/27/2015 12:00:00 AM
Mar 31 2016
40
Sewerage, Sewage Treatment & Disposal for Ghazipur, U.P.
Completed Project
Ghazipur
NGP
HAM
152.830000
50.960000
4.08
May 6 2020
96.170000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
21.0000
SBR
2
MPS (MLD)
26.0000
NA
3
Rising main (mtr.)
8.7000
NA
4
Effluent Disposal Line (km.)
0.2000
NA
5
Power Connection
2.0000
NA
M/s Mirzapur Ghazipur STPs Private Limited
140.940000
Jan 9 2024
4/10/2022 12:00:00 AM
Oct 30 2024
41
Interception & Diversion (I&D) of Drains and Sewerage Treatment Plant at Jaunpur , U.P.
Completed Project
Jaunpur
NGP
DBOT
206.050000
119.010000
9.25
Feb 12 2019
63.910000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
30.0000
A2O
2
Interception And Diversion
14.0000
NA
3
Rising main (mtr.)
2.3000
NA
4
Sewer Line (km.)
6.0900
NA
5
IPS (MLD)
13.1600
NA
6
IPS (MLD)
11.2400
NA
7
IPS (MLD)
8.9000
NA
M/s SPML- PPPL JV
164.000000
Oct 20 2021
10/21/2019 12:00:00 AM
Oct 20 2021
42
Pollution Abatement of Gomti River (Phase-II, Part-II ) Lucknow
Tendaring
Lucknow
NGP
HAM
351.030000
207.990000
13.14
Sep 19 2023
129.900000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
1.0000
_
2
STP (MLD)
100.0000
_
3
MPS (MLD)
100.0000
_
4
Boundary wall (mtr.)
550.0000
_
5
Strengthing of Drain
900.0000
_
6
Effluent Disposal Line (km.)
1.2000
Open cut
0.000000
43
Interception & Diversion and STP at Mirzapur, U.P.
Completed Project
Mirzapur
NGP
HAM
129.080000
50.500000
4.04
May 28 2020
73.060000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
8.5000
SBR
2
STP (MLD)
8.5000
SBR
3
Rising main (mtr.)
0.3000
NA
4
Effluent Disposal Line (km.)
2.3500
NA
5
Power Connection
2.0000
NA
6
Interception And Diversion
12.0000
NA
M/s Mirzapur Ghazipur STPs Private Limited
151.580000
Jan 9 2024
4/10/2022 12:00:00 AM
Jul 31 2024
44
Faecal Sludge Management for abatement of pollution in River Ganga at Chunar, Mirzapur, U.P.
Completed Project
Mirzapur
NGP
DBOT
2.700000
1.930000
0.29
Mar 7 2019
0.480000
Sr.No
Component Name
Capacity
Technology
1
FSTP(KLD)
10.0000
NA
2
Integrated Setlter & Anaerobic filter (ISAF)
1.0000
NA
3
Collection Tank
1.0000
NA
4
Sludge yard
1.0000
NA
5
Planted drying bed (PDBs)
9.0000
NA
M/S Elefo Biotech Pvt Limited
2.050000
Sep 8 2020
11/9/2019 12:00:00 AM
Nov 30 2021
45
I&D and Treatment works for Assi-BHU Area (Phase-II), Varanasi
On Going
Varanasi
NGP
DBOT
308.090000
97.620000
7.81
Oct 19 2022
172.940000
Sr.No
Component Name
Capacity
Technology
1
IPS (MLD)
6.0000
NA
2
Effluent Disposal Line (km.)
1.3200
NA
3
Rising main (mtr.)
2.1000
NA
4
Co-Treatment Facility(KLD)
10.0000
NA
5
STP (MLD)
55.0000
SBR
6
MPS (MLD)
50.0000
NA
7
Nala Tapping Arrangement ( No.)
2.0000
NA
M/s Enviro Infra Engineers limited MTS JV
151.550000
Dec 6 2025
3/7/2024 12:00:00 AM
Dec 6 2025
46
I&D and STP Work in Kairana
Completed Project
Shamli
CGF
DBOT
78.420000
37.280000
2.63
Dec 7 2020
38.510000
Sr.No
Component Name
Capacity
Technology
1
Rising main (mtr.)
0.0500
DI
2
Sewer Line (km.)
0.3000
RCC NP-3
3
Interception And Diversion
1.0000
-
4
Effluent Disposal Line (km.)
1.6000
DI
5
STP (MLD)
15.0000
SBR
6
MPS (MLD)
16.0000
-
7
Boundary wall (mtr.)
369.0000
Brick Masonary
8
Power Connection
1.0000
-
M/s SIPL RKC JV
59.190000
May 27 2023
8/28/2021 12:00:00 AM
Mar 31 2025
47
I&D and STP Work in Shamli
On Going
Shamli
NGP
DBOT
206.020000
103.190000
6.66
May 25 2023
96.170000
Sr.No
Component Name
Capacity
Technology
1
Rising main (mtr.)
0.1000
DI
2
Sewer Line (km.)
0.1000
RCC NP 3
3
Interception And Diversion
1.0000
-
4
Effluent Disposal Line (km.)
0.1000
-
5
STP (MLD)
40.0000
-
6
Co-treatment Unit for Fecal Sludge (KLD)
20.0000
-
7
MPS (MLD)
40.0000
-
8
Power Connection
1.0000
-
M/s R.K. Engineers Sales Ltd.-M/s Anand Constrwell Pvt. Ldt. (JV)
120.920000
Jan 13 2026
10/14/2024 12:00:00 AM
Apr 13 2026
48
I&D of Drains at Ayodhya-Ayodhya. DBOT, NGP
Completed Project
Ayodhya
NGP
DBOT
37.670000
16.260000
1.10
Jun 11 2018
20.310000
Sr.No
Component Name
Capacity
Technology
1
SPS (MLD) 2A
7.0000
SPS
2
Rising main (mtr.)
28.4500
SPS
3
Sewer Line (km.)
1.2050
SPS
4
I&D, Construction, Rehabilitation , O&M of 15 yrs
5.0000
SPS
M/S Satish kumar &co.
29.030000
Aug 16 2019
11/17/2018 12:00:00 AM
Aug 16 2019
49
I&D and STP Work in Thanabhawan, Shamli
On Going
Shamli
NGP
DBOT
97.190000
55.630000
3.50
May 25 2023
38.060000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
10.0000
NA
2
Interception And Diversion
3.0000
-
3
Sewer Line (km.)
5600.0000
RCC NP 3
4
Rising main (mtr.)
0.0400
DI
5
MPS (MLD)
10.0000
-
6
Co-treatment Unit for Fecal Sludge (KLD)
10.0000
-
7
Power Connection
1.0000
-
M/s R K Engineers Sales Ltd
63.720000
Jan 13 2026
10/14/2024 12:00:00 AM
Apr 13 2026
50
Sewerage and Non Sewerage Schemes for Pollution abatement of River Ganga at Allahabad U.P District A
Completed Project
PrayagRaj
EAP
DBOT
97.950000
97.950000
0.00
May 6 2010
0.000000
Sr.No
Component Name
Capacity
Technology
1
Laying/Replacement of Trunk Sewer
5.0400
NA
2
Desilting and Rehabilitation of Trunk Sewer
3.7800
NA
3
Rehabilitation of Sewer Line
1.8600
NA
4
Uppgradation of SPS
35.0000
NA
5
Upgradation of MPS
20.0000
NA
6
STP (MLD)
20.0000
ASP
M/s Ramky Infrastructure Ltd.
97.950000
Mar 7 2016
12/8/2010 12:00:00 AM
Mar 7 2016
51
I&D and STP Work in Muzaffarnagar
Completed Project
Muzaffarnagar
NGP
HAM
234.030000
108.320000
7.33
Jan 13 2020
118.360000
Sr.No
Component Name
Capacity
Technology
1
SPS (MLD) 2A
20.0000
-
2
Sewer Line (km.)
1.4790
-
3
Interception And Diversion
5.0000
-
4
Effluent Disposal Line (km.)
0.8000
-
5
Rising main (mtr.)
2.3950
DI
6
STP (MLD)
22.0000
SBR
7
STP (MLD)
32.5000
SBR
8
MPS (MLD)
27.0000
-
9
IPS (MLD)
8.3600
-
10
Co-treatment Unit for Fecal Sludge (KLD)
50.0000
-
11
Co-treatment Unit for Fecal Sludge (KLD)
50.0000
-
12
Power Connection
2.0000
-
M/S Muzaffarnagar STP Pvt Ltd
205.090000
Jun 3 2023
6/4/2021 12:00:00 AM
Mar 31 2025
52
I&D and STP works at Bagpat
Completed Project
Baghpat
NGP
DBOT
77.360000
38.720000
2.66
Feb 19 2019
35.980000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
2.3450
NA
2
Rising main (mtr.)
1.2000
NA
3
Interception And Diversion
4.0000
NA
4
STP (MLD)
14.0000
SBR
5
SPS (MLD) 2A
21.0000
NA
M/s ICPL-OASIS-LNA (JV)
65.490000
Apr 7 2021
1/8/2020 12:00:00 AM
Sep 30 2022
53
I&D and STP Work in Budhana Town
Completed Project
Muzaffarnagar
Non EAP
HAM
48.760000
25.100000
1.70
Feb 18 2019
21.960000
Sr.No
Component Name
Capacity
Technology
1
Rising main (mtr.)
0.1000
DI
2
Sewer Line (km.)
0.7000
RCC NP 3
3
Interception And Diversion
3.0000
-
4
Effluent Disposal Line (km.)
0.0500
-
5
STP (MLD)
10.0000
SBR
6
MPS (MLD)
12.0000
-
7
Power Connection
1.0000
-
8
Co-treatment Unit for Fecal Sludge (KLD)
10.0000
-
M/S Muzaffarnagar STP Pvt Ltd
41.280000
Jun 3 2023
6/4/2021 12:00:00 AM
Oct 31 2023
54
I&D and STP Work in Banat, Shamli
On Going
Shamli
NGP
DBOT
48.710000
24.930000
1.58
May 25 2023
22.200000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
5.0000
SBR
2
MPS (MLD)
5.0000
-
3
Rising main (mtr.)
0.0400
DI K 9
4
Interception And Diversion
2.0000
-
5
Sewer Line (km.)
0.6000
RCC NP 3
6
Co-treatment Unit for Fecal Sludge (KLD)
5.0000
-
7
Effluent Disposal Line (km.)
0.6000
-
8
Power Connection
1.0000
-
M/s R K Engineers Sales Ltd
37.920000
Jan 13 2026
10/14/2024 12:00:00 AM
Apr 13 2026
55
JICA Assisted Ganga Action Plan (GAP) Phase-II, Varanasi
Completed Project
Varanasi
NGP
DBOT
659.620000
629.160000
26.21
Jul 14 2010
0.000000
Sr.No
Component Name
Capacity
Technology
1
Laying of Relieving Trunk Sewer, Rising main
27.3000
NA
2
Construction of 03 Nos. Pumping stations
3.0000
NA
3
Construction of 140 MLD STP at Dinapur, Varanasi
140.0000
ASP
4
Rehabilitation of OTS (Km) (Package-4)
7.5000
NA
5
Reh.of Existing STPs, Ghat SPSs and Konia MPS
8.0000
NA
Pkg-1- M/s EMS Infracon Pvt. Ltd, Pkg-2- M/s UEM India Pvt. Ltd, Pkg-3- M/s Va Tech Wabag Ltd, Pkg-4- M/s Sriram EPC Ltd and Pkg-5- M/s Kirloskar Brothers Ltd
488.800000
Jun 27 2017
1/10/2013 12:00:00 AM
Jul 22 2022
56
I&D and STP Work in Bantikhera and Babri village, Shamli
On Going
Shamli
NGP
DBOT
55.470000
29.410000
1.84
May 25 2023
24.220000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
5.0000
SBR
2
Sewer Line (km.)
2.0000
RCC NP 3
3
MPS (MLD)
6.0000
-
4
Rising main (mtr.)
0.0400
DI K-9
5
Effluent Disposal Line (km.)
0.4000
-
6
Interception And Diversion
4.0000
-
7
Power Connection
1.0000
-
8
Co-treatment Unit for Fecal Sludge (KLD)
5.0000
-
M/s R K Engineers Sales Ltd
41.910000
Jan 13 2026
10/14/2024 12:00:00 AM
Aug 13 2026
57
I&D and STP works at Meerut
On Going
Meerut
NGP2-EAP
HAM
690.710000
363.780000
26.31
May 6 2020
280.190000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
220.0000
SBR
2
Interception And Diversion
2.0000
-
3
Sewer Line (km.)
0.5600
RCC
4
Rising main (mtr.)
0.1000
DI K-7
5
MPS
1.0000
-
6
Power Connection
1.0000
-
M/s. Meerut STP Pvt. Ltd.
369.739168
Nov 10 2026
11/11/2024 12:00:00 AM
Feb 10 2027
58
I&D and STP works at Saharanpur
Tendaring
Saharanpur
NGP2-EAP
HAM
577.230000
266.340000
20.55
Jun 16 2022
290.340000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
135.0000
-
2
MPS (MLD)
172.3300
-
3
Sewer Line (km.)
16.0000
RCC
4
Rising main (mtr.)
0.0500
-
5
Effluent Disposal Line (km.)
0.1000
-
6
Interception And Diversion
61.0000
-
7
Power Connection
1.0000
-
M/s Enviro Infra Engineers Ltd, Bhugan Infracon Pvt. Ltd. & Micro Transmission System, JV
343.880000
59
I&D and STP works at District-Hapur
On Going
Hapur
NGP
DBOT
49.060000
22.850000
1.42
Sep 19 2023
24.790000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
6.0000
SBR
2
MPS (MLD)
8.0000
SBR
3
Drains
1.0000
No
4
Others
1.0000
NA
M/s SKC Technocrat Pvt. Ltd (Formerly M/s Satish Kumar & Co.) & M/s. Geo Miller & Co. Pvt. Ltd. (JV)
39.281362
Feb 7 2026
11/8/2024 12:00:00 AM
60
FSSM In Dohrighat Town in Distt Mau
DPR
Mau
Non EAP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
FSTP(KLD)
10.0000
NA
0.000000
61
Interception and Diversion of Drains/Nala Falling in Varuna River and STP for Bhadohi Town
Tendaring
Sant Ravidas Nagar
NGP2-NON EAP
DBOT
127.260000
52.860000
4.23
Mar 6 2025
54.690000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
17.0000
NA
2
MPS (MLD)
21.0000
NA
3
IPS (MLD)
6.0000
NA
4
MPS (MLD)
3.0000
NA
5
STP (MLD)
5.0000
NA
6
STP (MLD)
3.0000
NA
0.000000
62
I&D and STP works for Durga Drain (Sewerage District-IV), Varanasi
Tendaring
Varanasi
NGP2-NON EAP
HAM
274.310000
107.700000
8.61
Mar 6 2025
97.500000
Sr.No
Component Name
Capacity
Technology
1
MPS (MLD)
70.0000
NA
2
Rising main (mtr.)
0.1200
NA
3
Effluent Disposal Line (km.)
0.1000
NA
4
Nala Tapping Arrangement ( No.)
1.0000
NA
5
STP (MLD)
60.0000
NA
0.000000
63
Garhmukteshwar Sewerage Scheme.
Completed Project
Hapur
Non EAP
DBOT
46.510001
40.680001
3.25
Feb 24 2011
2.580001
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
65.0000
150mm to 800mm dia
2
MPS (MLD)
11.5000
UASB
3
Effluent Disposal Line (km.)
0.8500
Trench Less
4
House Connecting Chamber
3000.0000
NA
5
STP (MLD)
3.0000
UASB
6
STP (MLD)
6.0000
UASB
M/s Anandi Lal Lalpuriya JV M/s Krishna Contractors JV M/s Khilari SS
32.710001
Apr 30 2018
9/7/2011 12:00:00 AM
Apr 30 2018
64
Narora Sewerage Scheme
Completed Project
Bulandshahr
EAP
DBOT
48.450000
39.730000
2.26
Mar 4 2014
6.460000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
25.5700
150mm to 600mm dia
2
MPS (MLD)
5.4400
UASB
3
IPS (MLD)
2.1400
NA
4
House Connecting Chamber
1462.0000
NA
5
STP (MLD)
4.0000
SBR
M/s EMS India Pvt Limited JV with M/s UEM India Pvt Ltd
37.730000
Mar 31 2018
6/15/2015 12:00:00 AM
Mar 30 2018
65
Anupshahar Sewerage Scheme
Completed Project
Bulandshahr
EAP
DBOT
75.790000
67.120000
5.27
May 19 2014
3.400000
Sr.No
Component Name
Capacity
Technology
1
Sewer Line (km.)
58.8700
150 mm to 600mm
2
Effluent Disposal Line (km.)
0.7000
600mm dia
3
MPS (MLD)
7.4000
UASB
4
House Connecting Chamber
2786.0000
NA
5
STP (MLD)
1.5000
MBBR
6
STP (MLD)
1.0000
MBBR
M/s Laxmi Construction & Co JV M/s Backcone Enterprises JV M/s Oasis OPC Solution
69.300000
Sep 30 2018
5/19/2014 12:00:00 AM
Sep 30 2018
66
I&D and STP Work in Deobandh
Tendaring
Saharanpur
NGP
DBOT
134.710000
67.420000
4.46
Jul 25 2024
62.830000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
20.0000
SBR
2
MPS (MLD)
28.0000
-
3
Rising main (mtr.)
0.0500
DI
4
Sewer Line (km.)
3.8250
RCC NP3
5
Power Connection
1.0000
-
0.000000
67
Pollution Abatement of Gomti River (Phase-III ) Lucknow
DPR
Lucknow
NGP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
75.0000
SBR
2
Rising main (mtr.)
9.1000
_
3
MPS (MLD)
75.0000
_
0.000000
68
I&D of Kashipur drain and Augmentation of Kodra STP by 28 MLD (Sewerage District - E) at Prayagraj
DPR
PrayagRaj
NGP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
SPS (MLD) 2A
8.0000
NA
2
MPS (MLD)
28.0000
NA
3
STP (MLD)
28.0000
NA
4
Rising main (mtr.)
0.3600
NA
5
Intercepting Sewer (km)
3.9300
NA
6
Effluent Disposal Line (km.)
0.3000
NA
7
Interception And Diversion
1.0000
NA
0.000000
69
Gulaothi I&D works
Tendaring
Bulandshahr
NMCG
DBOT
50.980000
17.130000
1.37
Aug 28 2024
13.200000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
10.0000
-
2
Interception And Diversion
1.0000
-
0.000000
70
I & D and Treatment for Barhalganj 7 Drains Falling in Ghaghra River.
DPR
Gorakhpur
NMCG
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
6.0000
-
0.000000
71
I & D and Treatment for 8 Drains out of 9 Drains Falling in Rapti River
DPR
Gorakhpur
NMCG
HAM
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
44.0000
-
0.000000
72
STP and I&D Work in Tanda nagar palika parishad ambedkarnagar
DPR
Ambedkar Nagar
NMCG
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
15.0000
SBR
2
Rising main (mtr.)
2.8000
500mm dia DI K-7
0.000000
73
Aligarh Sewerage Scheme (I&D And STP Works)
Tendaring
Aligarh
NMCG
HAM
496.020000
240.020000
15.12
Oct 21 2024
240.880000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
65.0000
SBR
2
STP (MLD)
48.0000
SBR
0.000000
74
Interception & Diversion Of 14 Untapped Drains Of Kanpur City (Along with Supplementary Works)
Tendaring
Kanpur Nagar
NGP2-NON EAP
DBOT
138.110000
97.170000
7.77
May 2 2025
2.030000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
14.0000
I&D
0.000000
75
Prevention of Pollution of River Ramganga at Moradabad under zone-3 & 4 construction of Interception & Diversion (I&D) of Drains and Sewerage Treatment Plant
Tendaring
Moradabad
NMCG
HAM
420.410000
238.530000
14.14
May 2 2025
181.870000
Sr.No
Component Name
Capacity
Technology
1
MPS (MLD)
46.0000
SBR
2
MPS (MLD)
62.0000
SBR
3
Rising main (mtr.)
0.0400
SBR
4
Rising main (mtr.)
0.0400
SBR
5
Effluent Disposal Line (km.)
0.2000
SBR
6
Effluent Disposal Line (km.)
0.2000
SBR
7
Sewer Line (km.)
1.0500
SBR
8
Sewer Line (km.)
1.6500
SBR
9
STP (MLD)
15.0000
SBR
10
STP (MLD)
65.0000
SBR
0.000000
76
Pollution Abatement of Gomti River (Phase-IV), Lucknow
DPR
Lucknow
NMCG
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
120.0000
-
2
MPS (MLD)
120.0000
-
3
Rising main (mtr.)
7250.0000
-
4
IPS (MLD)
38.7500
-
5
Interception And Diversion
2.0000
-
0.000000
77
Balance Darins Tapping and Augmentation of SPSs at Agra City
DPR
Agra
NGP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
Interception And Diversion
61.0000
I&D
0.000000
May 31 2024
5/31/2024 12:00:00 AM
May 31 2024
78
Upgradation and Capacity Augmentation of Existing 80 MLD STP Dinapur in Varanasi
DPR
Varanasi
NGP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
220.0000
NA
2
MPS (MLD)
250.0000
NA
3
Effluent Disposal Line (km.)
3150.0000
RCC NP3 2600 mm
4
Rising main (mtr.)
4200.0000
MS Pipe 1800 mm
0.000000
79
I&D and STP works at Pt Deen Dayal Upadhyay Nagar Chandauli
Tendaring
Chandauli
NGP2-NON EAP
HAM
262.780000
95.000000
7.60
Jan 22 2025
129.670000
Sr.No
Component Name
Capacity
Technology
1
Effluent Disposal Line (km.)
0.6000
NA
2
Rising main (mtr.)
3750.0000
500 mm DI K-9
3
Rising main (mtr.)
60.0000
800 mm DI K-9
4
STP (MLD)
45.0000
NA
5
MPS (MLD)
33.0000
NA
6
SPS (MLD)
12.0000
NA
0.000000
80
DPR OF 08 KLD Fecal Sludge Treatment Plant At Dalmau Raibareli
Tendaring
Rae Bareli
NMCG
DBOT
4.400000
3.010000
0.18
Aug 28 2024
1.210000
Sr.No
Component Name
Capacity
Technology
1
FSTP(KLD)
8.0000
SBR
0.000000
81
Pollution Abatement Of Gomti River (Phase 1 Part 1) Lucknow
On Going
Lucknow
NGP
DBOT
240.930000
123.450000
6.97
Jul 29 2024
110.510000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
3.5000
SBR
2
MPS
3.5000
-
3
Interception And Diversion
1.0000
-
4
Uppgradation of SPS
1.0000
Nagaria
5
Uppgradation of SPS
1.0000
Sarkata
6
Uppgradation of SPS
1.0000
Pata
7
STP (MLD)
39.0000
SBR
M/s R.K. Engineers- Khilari Infrastructure (JV)
187.900000
Jun 6 2026
9/7/2024 12:00:00 AM
82
Interception and Diversion of Additional flow from Sasurkhaderi Drain and Augmentation of Numayadahi STP in Sewerage District-B, Prayagraj
DPR
PrayagRaj
NGP
DBOT
0.000000
0.000000
0.00
Jan 1 1900
0.000000
Sr.No
Component Name
Capacity
Technology
1
STP (MLD)
44.0000
NA
0.000000
83
Faecal Sludge Management for Pollution abatement of river Ganga at Manikpur, Pratapgarh